Papers in conference proceedings


Józefowska J., Identification and modelling of various decision situations in scheduling of Flexible Manufacturing Systems, Proc.8th Int. Seminar on Production Control and Scheduling, Karlovy Vary, 1988, 255-260.

Pacholski L, Józefowska J., Pawłowski E., Współczesne technologie w projektowaniu i eksploatacji przemysłowych systemów produkcyjnych, XVII Krajowa Konferencja Ergonomiczna: Ergonomia w projektowaniu, Wrocław-Karpacz Górny, 12-14.10.1989, 46-61.

Józefowska J., Scheduling a flow shop to minimize the maximal lateness under arbitrary precedence constraints, in: CIM in Process and Manufacturing Industries, IFAC Workshop (Espoo, Finland 1993), Pergamon Press (Oxford, UK) ISBN 0 08 042182 2, editor: K. Leiviska, 121-126.

Józefowska J., Piesik P., Węglarz J., Scheduling a Flexible Manufacturing System with RUNSIM, Proceedings of the CAPE 10 International Conference, Palermo June 6-9, 1994, 555-559.

Józefowska J., Waligóra G., Węglarz J., A tabu search algorithm for discrete-continuous scheduling problems, Proc. of the Int. Conf. on Applied Decision Technologies, Brunel University London, 3-5 April 1995, 253-260.

Janiak M., Józefowska J., Scheduling a container assembly line, Proc. International Conference on Industrial Engineering and Production Management, vol. I, Marrakech, Marokko, April 4-7, 1995, 226-232.

Józefowska J., Mika M., Różycki R., Waligóra G., Węglarz J., Local search metaheuristics for discrete-continuous scheduling problems, PMS’96 The Fifth International Workshop on Project Management and Scheduling: Abstracts, April 11-13, 1996, Poznań, 131-134

Józefowska J., Mika M., Różycki R., Waligóra G., Węglarz J., Discrete-continuous scheduling to minimize maximum lateness, Proc. Int. Cof. Methods and Models in Automation and Robotics, Międzyzdroje 1997, 947-952.

Józefowska J., M. Mika, R. Różycki, G. Waligóra, J. Węglarz, Scheduling precedence constrained nonpreemptable jobs on parallel machines with additional discrete-continuous resources, Proc. 5th International Symposium on Methods and Models in Automation and Robotics, Międzyzdroje 1998, vol. 3, 1041-1046.

Józefowska J., G. Waligóra, J. Węglarz, Tabu search with the cancellation sequence method for a class of discrete-continuous scheduling problems, Proc. 5th International Symposium on Methods and Models in Automation and Robotics, Międzyzdroje 1998, vol. 3, 1047-1052.

Józefowska J., M. Mika, R. Różycki, G. Waligóra, J. Węglarz, On discrete-continuous project scheduling,. 6th International Workshop on Project Management and Scheduling, Extended Abstracts, 7-9 July 1998, Istambul, Turkey, 72-75.

Błażewicz J., Józefowska J., Węglarz J., Informatik in Modernen Fertigungssystemen, Mat. Konferencji Naukowo-Technicznej: Kształcenie w Zakresie Wysoko Zaawansowanych Technologii, Poznań, 14-15 czerwca 1996, Wyd. PP 1998, 45-47.

Józefowska J., M. Mika, R. Różycki, G. Waligóra, J. Węglarz, A heuristic approach to allocating the continuous resource in tabu search for discrete-continuous scheduling problems, Proc. of the 6th International International Symposium on Methods and Models in Automation and Robotics, Międzyzdroje 2000, 871-876.

Józefowska J., M. Mika, R. Różycki, G. Waligóra, J. Węglarz, A performance analysis of a simulated annealing algorithm for the project scheduling problem, Proc. of the 6th International International Symposium on Methods and Models in Automation and Robotics, Międzyzdroje 2000, 865-870.

Józefowska J., M. Mika, R. Różycki, G. Waligóra, J. Węglarz, On a discrete transformation of the discrete-continuous project scheduling problem, 7th International Workshop on Project Management and Scheduling, Osnabrück, 17-19 April 2000, Extended Abstracts, 171-173.

Józefowska J., M. Mika, R. Różycki, G. Waligóra, J. Węglarz, Solving a multimode resource constrained project scheduling problem by simulated annealing, 7th International Workshop on Project Management and Scheduling, Osnabrück, 17-19 April 2000, Extended Abstracts, 174-176.

Józefowska J., M. Mika, R. Różycki, G. Waligóra, J. Węglarz, On preemptive Cmax scheduling of dependent tasks on parallel identical machines, Proc. 7th IEEE International Symposium on Methods and Models in Automation and Robotics, Międzyzdroje 2001, 485-488.

Józefowska J., R. Różycki, G. Waligóra, J. Węglarz, Solving discrete-continuous scheduling problems by tabu search, Proc. of the 4th Metaheuristic International Conference, MIC 2001, Porto, 2001, 667-671.

Józefowska J., Optimization criteria for Just-in-Time scheduling, Proc. 3rd International Workshop on Logistics, „Informatics and Internet Applications in Logistics”, Zielona Góra 2001, 25-30.

Józefowska J., M. Mika, R. Różycki, G. Waligóra, J. Węglarz, An Optimal Procedure for the Preemptive Cmax Scheduling of Dependent Tasks on Parallel Identical Machines Eight International Workshop on Project Management and Scheduling, Valencia, Spain, 2002, 213-216.

Józefowska J. J. Węglarz, New Results for Discrete-Continuous Mean Flow Time Scheduling Problems, Eight International Workshop on Project Management and Scheduling, Valencia, Spain, 2002, 217-220.

Józefowska J., Mika M., Różycki R., Węglarz J., On a resource based classification of project scheduling problems, 8th IEEE Conference on Methods and Models in Automation and Robotics, Szczecin, 2002, 1103-1108.

Jozefowska J., Waligora G., Węglarz J., Properties of discrete-continuous schedules with minimum mean flow time, 8th IEEE Conference on Methods and Models in Automation and Robotics, Szczecin, 2002, 1085-1090.

Józefowska J., Muras M., Exact and heuristic approaches to single machine earliness-tardiness scheduling, Proc. 6th Internat. Conf. on Industrial Engineering and Production Management, vol. 3, Porto 2003, 285-294.

Józefowska J. A. Zimniak, MPS optimisation module for MRP planning system, Proc. AUTOMATION 2004, Warszawa 2004, 305-312.

Józefowska J., M. Muras, A branch and bound algorithm for single machine earliness-tardiness scheduling, in: A. Oulamara, M-C. Portmann (Eds.), Abstracts of the Ninth International Workshop on Project Management and Scheduling, Nancy 2004, 128-131.

Józefowska J., Różycki R., J. Węglarz, Discrete-continuous scheduling problem with machine dependent proecessing rates, in: A. Oulamara, M-C. Portmann (Eds.), Abstracts of the Ninth International Workshop on Project Management and Scheduling, Nancy 2004, 226-229.

Józefowska J., Różycki R., J. Węglarz, Scheduling Non-preemptable Jobs on Resource Driven Uniform Parallel Machines, in: Domek S., Kaszyński R. (Eds.), Proc. 10th IEEE Conference on Methods and Models in Automation and Robotics, Międzyzdroje 2004, 1221-1225.

Józefowska J., M. Muras, A Tabu Search Algorithm for Single Machine Just in Time Scheduling, in: Domek S., Kaszyński R. (Eds.), Proc. 10th IEEE Conference on Methods and Models in Automation and Robotics, Międzyzdroje 2004, 1255-1260.

Józefowska J., A. Zimniak, A Multiple Criteria Genetic Algorithm Operating on a Reduced Search Space, in: Domek S., Kaszyński R. (Eds.), Proc. 10th IEEE Conference on Methods and Models in Automation and Robotics, Międzyzdroje 2004, 1379-1384.

Józefowska J., Zimniak A., Optimization tool for production planning and scheduling, E-Proc. of the International Conference on Industrial Engineering and Systems Management, Marrakech, Morocco, May 16 – 19, 2005.

Józefowska J., Muras M., Scheduling of unweighted jobs with unit processing times and k common due-dates, 11 IEEE International Conference on Methods and Models in Automation and Robotics, Międzyzdroje, 2005, 1125-1130.

Bauman J., Józefowska J., Algorytm heurystyczny szeregowania zadań w systemach just-in-time, Efektywność wdrażania technologii informatycznych, Mat. VII Ogólnopolskiej Konferencji Naukowo-Technicznej Komputer w Ochronie Środowiska, PZITS, Gniezno 2005, 23-31.

Józefowska J., Józefowski Ł., Kubiak W., Classification of PRV methods in the context of the apportionment theory, in: Abstracts of the Tenth International Workshop on Project Management and Scheduling, Poznań 2006, 200-203.

Józefowska J., Ławrynowicz A., Łukaszewski T., Faster frequent pattern mining from the Semantic Web, Proceedings of International IIS: IIPWM06 Conference, New Trends in Intelligent Information Processing and Web Mining, Advances in Soft Computing, Springer Verlag 2006, 121-130.

Daćko D., Józefowska J., Ławrynowicz A., An ontology based semantic library catalogue, Proc. 3rd Language & Technology Conference, Z. Vetulani (ed.) Poznań 2007, 109-113.

Józefowska J, Ławrynowicz A., Łukaszewski T., A study of the SEMINTEC approach to frequent pattern mining, Proc. of the Workshops „Prior Conceptual Knowledge in Machine Learning and Data Mining” and „Web Mining 2.0”, Warszawa 2007, 41-52.

Józefowska J., Józefowski Ł., Kubiak W., Apportionment Methods in Discrete Resource Allocation Problems, Proceedings of the 11th International Workshop on Project Management and Scheduling, Istanbul 2008, 160-163.

Józefowska J., Józefowski Ł., Kubiak W., About the relation between the Relative Fairness Bound (RFB) and the apportionment problem, Proceedings of the 1st IEEE International Conference on Information Technology, Gdańsk 2008, 535-538.

Józefowska J, Ławrynowicz A., Łukaszewski T., Combining answer catching with smartcall optimization in mining frequent DL-safe queries, Proc. 18th International Conference ILP 2008, Late Breaking Papers, Prague 2008, 57-62.

Józefowska J., Józefowski Ł., Kubiak W., Fairness of schedule in the control of packet-switched networks. Proceedings of the 14th International Conference on Methods and Models in Automation and Robotic, Międzyzdroje 2009, F-27.

Józefowska J., Józefowski Ł., Kubiak W., Dynamic divisor-based resource scheduling algorithm, Proc. of the 12th International Workshop on Project Management and Scheduling, Tours, 2010, 265-268.

Józefowska J. PRV minimization on parallel machines, Proceedings of the 13th International Workshop on Project Management and Scheduling, Leuven, 2012, 179-182.

Łukaszewski T., Józefowska J., Ławrynowicz A., Attribute Value Ontology. Using Semantics in Data Mining, Proc. 14th International Conference on Enterprise Information Systems ICEIS 2012, Wrocław 2012, Volume 2, 329-334.

Gosławski M., Józefowska J., Kulus M., Nossack J., Scheduling orders with mold setups in an injection plant, Proc. of the 14th International Conference on Project Management and Scheduling, Munich, 2014, 100-103

back